3
variants of aircraft location
4С
class aerodrome (ICAO)
2500
runway lenght``
Scope of works for this contract the included following activities:
• examination of existing coverings of an artificial runway, taxiway and passenger apron;
• an act of survey of airfield coverings was compiled;
• an estimation of the possibility of operation at an aerodrome of aircrafts on an assignment;
• calculations were carried out on the options for the reconstruction of the aerodrome to improve its operational characteristics, and their estimated cost was determined.