Detailed Design for the reconstruction of the airfield complex "Odessa International Airport"

As part of the contract for execution of working documentation were fulfilled and, the following construction projects:
1. Grading, excavation and airfield pavements:
– a new runway;
– taxiway RD-A1;
– part of the taxiways RD-A2 to A4 and RD;
– taxiway-taxiway A5 to the existing runway (for taxiing aircraft Defense sector and the exit of fire engines to the southern end of the new AAR);
– old end portions compound runway with a carrier coated RD-A1;
– connective RD-C3 from the new RD-A1 of the existing RD-1 and the platform at the new terminal.

2. Buildings and airfield facilities:
– AGL new AAR device according IIIa category with MKpos 337 ° and with category I MKpos 157 °;
– diversion of surface runoff into sewage treatment plants;
– sewage treatment plants runoff from the pool-drive;
– drain water collector from sewage treatment plants to the city networks rainwater;
– rescue station;
– ILS systems for new AAR IIIa category with MKpos 337 ° and with category I MKpos 157 °;
– DVOR / DME (including dismounting existing VOR / DME);
– TP 22, TP 23 and TP 24 from ACS, TP-25 / S, TP-25 / II.